Early Supplier Involvement During The Development of the Response to a Design-Build RFP

In April 2016, the design-build team of Foley Company and Black & Veatch was awarded the Blue River WWTP Odor Control Phase 1 design-build contract for Kansas City, MO, Water Services Department. The proposal submitted contained two parts: 1) technical proposal and 2) lump sum fixed price with a 20-year life cycle cost analysis. The criteria for selecting the design-build team was a point system developed to evaluate the team’s technical background, experience, project approach, lump sum fixed-price construction and engineering work, and the life cycle operation and maintenance cost analysis.