Category Archives: Garney

Is Design-Build Right for Your Smaller Project?

Design-build has become the fastest-growing delivery method in the water/wastewater industry across the nation. Cost certainty and accelerated schedules have encouraged most states to embrace the design-build model. In the current market, large-scale design-build projects receive most of the headlines, but design-build can be a perfect fit for your small-scale projects.

Read More →
Topics: Collaborative Delivery, Design-Build, Garney.

Value Engineering’s Role in Collaborative Delivery

What is Value Engineering? Value engineering (VE) is a creative, systematic approach to providing the essential functions of a project at the best value. Successful VE results are achieved through an open, collaborative review of the project that considers life cycle costs, performance, quality, reliability, and safety. VE is one of the many benefits that collaborative-delivery methods such as CMAR, design-build, and progressive design-build offer to project owners.

Read More →
Topics: Garney, Value Engineering.